Gallery

Here you can find images showing the CERF facility: the target cave, H6 beam line, the PIC reference monitor, the concrete and iron roof reference positions.
Click on Next / Previous at the bottom of the page to switch between photo galleries.
CERF concrete top

CERF concrete top

CERF design

FLUKA modelling of the CERF facility

GEM right

The GEM system to measure the beam at the entrance and exit from the copper target

GEM left

The GEM system to measure the beam at the entrance and exit from the copper target

GEM front

The GEM system to measure the beam at the entrance and exit from the copper target

CT instruments 2

View of the concrete top with instruments under measurement

CT instruments 1

View of the concrete top with instruments under measurement

PIC reference ion chamber

The PIC reference ion chamber with a second chamber under test

SPS beam

The time profile of the SPS beam

CERF iron top

CERF iron top